Hi all,
I'm setting up the Workcenters/ roles for service technicians.
Can anyone can help me with the configuration of making the tabs parts, service time and expense visible?
I have a brief instruction in a presentation (1511 Cloud for Service-Field Service/ Slides 92-96) but are missing information in this instruction.
The instruction says it is based on assignment in "BC (See slide 8)". I'm missing slide 8 and I don't know what they mean with BC.
Who can help me? Thank you very much.